Laying power cables in existing tunnels can not only save land resources, but also improve the utilization rate of urban space. At the same time, it also has important practical significance for expanding the construction and development space of urban power grid. Therefore, in order to assess the safety risk level of cables laid in the built tunnels, the safety risk assessment index system of laying cables using existing tunnels is established, which contains 19 evaluation indexes, involving 8 sub-systems such as cable tunnel structure, lighting system and power supply system. Finally, the fuzzy analytic hierarchy process (AHP) method is employed to evaluate the safety risk of a power cable laying project in an existing tunnel. The results show that the risk level of laying cable trench in the built tunnel is low, and the feasibility of laying power cable in the built underground traffic tunnel is also proved.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.