The pile foundation is one of a kind of deep foundation that serves to funnel structural loads to hard soil layers that have a high carrying. The purpose of this study was to calculate the bearing capacity of piles. Based on SPT data obtained and calculated by Mayerhoff method at point BH-01 Qult = 259,992 tons, at point BH-02 Qult = 258,234 tons, and at point BH-03 Qult = 279.586 tons, with HSPD data obtained based on reading dial pressure manometer tool is approximately from 178,365 tons-186,120 tons, whereas with PDA obtained based on RMX value on PDA test is about 124 tons-225 tons. The results of the calculation of bearing capacity there are differences in values, both from the use of calculation methods and the location of points reviewed. From the results of the calculation can be concluded that the big highets bearing capacity the pile is values of SPT. In values of HSPD and PDA is relative same because the method using similar method (hydraulic and wave method).
This research was conducted to find out the availability of water to the requirements of water and also predict flood plan discharge for return period based on hydrological analysis in Comal River. Calculations are carried out using rainfall data obtained from PUSDATARU of Pemali-Comal from 1999-2017. Used the rain station in the region of Comal Watershed, there are 7 rain stations. Catchment area of rain station used Thiessen Polygon Method to know value of catchment area of each rain station. The Gumbel distribution (Generalized Extreme Value distribution Type-I) is used to model the distribution of the maximum (or the minimum) of a number of samples of various distributions. The calculation of the flood discharge design is using the Nakayasu, Rational, Weduwen, Weduweden, and Haspers method. Based on the result of this research it can be concluded that the biggest water potential occurs in January is 199.60 m3/s and the smallest in August is 0.84 m3/s. Cropping pattern carried out with one year there are three cropping patterns, namely paddy-paddy-secondary crops. For the water requirements, enough can be fulfilled, but in August and September, where the planting period III for the secondary crops experiences a deficit. The method used to design flood discharge is the Nakayasu method. For the embankment construction and normalization is profitable.
Project management is all planning, implementation, controlling and coordination a project from early the (idea) the end project to en sure of the project appropriately time, money and quality. Selection method scheduling project is also one the very policy note in order to obtain result in according with the original plans. This thesis specifically discuss how project management planning the construction of a Boarding house Tegal parang, South Jakarta. The research was conducted by means of a survey into the field and study of literature. This thesis analysis includes volume calculation, Needs of labor, materials and equipment, Bar chart, Cash flow, S Curve, method of CPM (Critical Path Method) is a method of identifying critical work paths or items. Forwards calculation, backwards calculation, free float and total float.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.