This study aims to calculate the standard time to produce the right time in producing corn thresher machine, so that the production capacity in one month is obtained at CV. Citra Dragon. Observations was made in the manufacture of corn threshing machine. Working time data was collected using stopwactch time study and adjustment method used was Westinghouse. The research method use was to analyze the work done by operators in the manufacture of corn thresher machine, and calculate the operator’s working time per work element. The result showed that the standard time needed in the process of making 1 unit of corn thresher machine is 78.603 second (21 hours) and the production capacity per month is 7 units of corn thresher machine.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.