Abstract. The grid integration of renewable energy supposesan important problem to deal with for Distributor System Operators (DSO). Distributor and transmission system operators have been using static rates for a long time to manage electric systems. Currently operators deal with one, annual, static rate or four, seasonal, static rates. This paper is devoted to the analysis of a real case of ampacity management in a 132 kV overhead line for the purpose of stablishing new static rates based on different temporal intervals.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.