This paper studies a complex parallel scheduling problem with non-crossing constraint, sequence dependent setup times, eligibility restrictions, and precedence relationships motivated by reclaimer scheduling in dry bulk terminals. In a stockyard of any dry bulk terminal, stockpiles are handled by reclaimers. Therefore, improving the operational efficiency of reclaimers is critical for the overall performance of these terminals which are struggling with increasing workload. We study the variants of this problem with and without stacking operations. For each variant, we present a lower and an upper bound. A strong lower bound is obtained by relaxing the non-crossing constraint and solving the resulting problem to the optimality. While this relaxation still addresses a challenging scheduling problem, proposed arc-time-indexed formulation copes with the instances of practical size. We develop a novel constraint programming formulation to provide an upper bound for the problem. Computational experiments show this robust approach is able to generate near-optimal schedules for different stockyard configurations within a minute.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.