A heuristic algorithm is developed and applied to determine lot sizes and production sequence on a single facility. The various product demands are treated as deterministic and time varying (dynamic) over a finite planning horizon, such as that generatedfrom a material requirements planning (MRP) system. In contrast to other approaches available, the algorithm considers the sequencing decision in each period by realistically assuming inventory holding cost occurrence in the period of production, and in addition, it is capable of considering set-up times where such set-up times consume available productive capacity. The ability to handle numerous products, and the capability of being able to specify maintenance time and holidays is an integral aspect of the algorithm.The results of an application of the algorithm in a medium size bearing company have shown very significant reduction in the controllable inventory holding cost while eliminating late deliveries. In an effort to cope with potential realistic schedule alterations, different solutions were developed for managerial evaluation providing greater flexibility but at a higher cost.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.