Construction management is very necessary in project management. To increase the efficiency and effectiveness of construction development activities, a unit price calculation tool is needed, namely construction cost analysis. Contractors generally make bid prices based on analysis that is not entirely guided by BOW (Burgerlijke Openbare Werken) analysis or SNI (Standart National Indonesia) analysis. Contractors tend to calculate the unit price of work using their own analysis which is based on previous experience in completing a construction work. The purpose of this study was to analyze the unit price of work on the building using the SNI, BOW and Field methods. The work components analyzed in this study are the unit price of materials and wages for partner work and foundation work. In each calculation method used, the most economical cost budget plan is obtained, namely using the field method calculation with the unit price value for the work of a partner, it costs Rp. 509.9996.78 while for foundation work it costs Rp. 722,965.1. By using the field method, a unit price is more economical when compared to BOW and SNI methods. So that these results can be used as a reference in planning the budget for a construction project.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.