This study is an extended and comprehensive analysis to accomplish optimal sizing for a biological nutrient removal (BNR) system with an A 2 O BNR activated sludge process using activated sludge models (ASM) kinetic models. A highly nonlinear activated sludge model combined with the EAWAG Bio-P module is formulated and optimized using a generalized reduced gradient solver. Primary and final clarifications are included with the A 2 O biotreatment scheme along with oxygen-supplying units. This paper includes a detailed description of model formulation, problem definition and discussion of optimal design in terms of capital (CAPEX) and operating (OPEX) cost estimates. The optimization problem is formulated and solved using typical cost factors and operating/design constraints applied to a typical illustrative system treating medium-strength wastewater. Results indicated that maintenance and sludge disposal expenditures represent more than 50% of the total annual cost and 80% of the annual running operating cost. Another major finding was that a primary clarifier is found to be cost ineffective in the A 2 O BNR process. Sensitivity of the optimal solutions and model performance to varying inflow conditions and to other effluent limits and model parameters will be discussed in another paper.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.