Our design provides satisfactory performance in identifying ADR related posts for post-marketing drug surveillance. The overall design of our system also points out a potentially fruitful direction for building other early warning systems that need to filter big data from social media networks.
This paper presents a general disruption management approach for a two-stage production and inventory control system. A penalty cost for deviations of the new plan from the original plan is incorporated and the concept of a disruption recovery time window is introduced. We define two classes of problems: one with fixed setup epochs and another with flexible setup epochs. With linear or quadratic penalty functions for production/ordering quantity change and fixed setup epochs, the best recovery plan is obtained by solving a quadratic mathematical programming problem. With convex penalty functions for quantity changes and flexible setup epochs, it is shown that the second stage orders have identical order quantities within each production cycle. Therefore, in a lot-for-lot system, the ordering and production quantities for both stages are the same. As a special case, we consider disruption recovery problems with short time windows spanning one or two production cycles. We also discuss solution procedures for both major and minor disruption problems and give an extension for the case of multiple retailers. Throughout the paper managerial insights are presented that indicate how a company should respond to various types of disruptions during its operations.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.