PurposeConstruction delay is the most common issue and creates many adverse effects in any construction industry. This study has investigated the views of engineers, project managers and contractors on the causes of delay during a construction phase to identify potential delay factors, negative effects on project delivery and prioritize the delay factors.Design/methodology/approachAn extensive literature review and interview with construction stakeholders have been conducted to identify potential causes of construction delays and design a questionnaire survey. The final questionnaire was designed with 40 potential delay factors, and a total of 102 valid Bangladeshi construction stakeholders responded to it. The result was analyzed by the relative importance index.FindingsAmong the 40 delay factors, the top five most influencing delay factors are “delay in progress payments,” “rework due to mistakes during construction,” “lack of skilled labor,” “poor monitoring and control of activities” and “delays in the making of a decision.” The top five most damaging effects of delay are “time overrun,” “cost overrun,” “disputes,” “arbitration” and “litigation,” among ten negative effects of construction delay. All construction stakeholders believe that the owner-related, consultant-related and contractor-related groups are the first, second and third most important groups of delay factors.Originality/valueThe outcome of this study would enable the Bangladeshi construction industry to develop strategies to overcome delay factors and their harmful effects. By focusing on the outcome of this research and prioritizing the critical factors, the construction industry of Bangladesh will be able to minimize construction delay significantly and propagate the progress of the construction industry by delivering quality projects timely.
PurposeApplication of appropriate shading device strategies in buildings can reduce direct solar heat gain through windows as well as optimize cooling and artificial lighting load. This study investigates the impact of common shading devices such as overhangs, fins, horizontal blinds, vertical blinds and drapes on energy consumption of an office building and suggests energy efficient shading device strategies in the contexts of unique Bangladeshi subtropical monsoon climate.Design/methodology/approachThis research was performed through the energy simulation perspective of a prototype office building using a validated building energy simulation tool eQUEST. Around 100 simulation patterns were created considering various types of shading devices and building orientations. The simulation results were analysed comprehensively to find out energy-efficient shading device strategies.FindingsOptimum overhang and fin height is equal to half of the window height in the context of the subtropical climate of Bangladesh. South and West are the most vulnerable orientations, and application of shading devices on these two orientations shows the highest reduction of cooling load and the lowest increment of lighting load. An existing building was able to save approximately 7.05% annual energy consumption by applying the shading device strategies that were suggested by this study.Originality/valueThe shading device strategies of this study can be incorporated into the Bangladesh National Building Code (BNBC) as new energy-efficient building design strategies because the BNBC does not have any codes or regulations regarding energy-efficient shading device. It can also be used as energy-efficient shading device strategies to other Southeast Asian countries with similar climatic contexts of Bangladesh.
The incorporation of waste materials generated in many industries has been actively advocated for in the construction industry, since they have the capacity to lessen the pollution on dumpsites, mitigate environmental resource consumption, and establish a sustainable environment. This research has been conducted to determine the influence of different rice husk ash (RHA) concentrations on the fresh and mechanical properties of high-strength concrete. RHA was employed to partially replace the cement at 5%, 10%, 15%, and 20% by weight. Fresh properties, such as slump, compacting factor, density, and surface absorption, were determined. In contrast, its mechanical properties, such as compressive strength, splitting tensile strength and flexural strength, were assessed after 7, 28, and 60 days. In addition, the microstructural evaluation, initial surface absorption test, = environmental impact, and cost–benefit analysis were evaluated. The results show that the incorporation of RHA reduces the workability of fresh mixes, while enhancing their compressive, splitting, and flexural strength up to 7.16%, 7.03%, and 3.82%, respectively. Moreover, incorporating 10% of RHA provides the highest compressive strength, splitting tensile, and flexural strength, with an improved initial surface absorption and microstructural evaluation and greater eco-strength efficiencies. Finally, a relatively lower CO2-eq (equivalent to kg CO2) per MPa for RHA concrete indicates the significant positive impact due to the reduced Global Warming Potential (GWP). Thus, the current findings demonstrated that RHA can be used in the concrete industry as a possible revenue source for developing sustainable concretes with high performance.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.