A complex combination of influencing factors and extensive planned interventions must be considered when planning hydropower production. In addition to electricity production, the main goal is conservation of the run-off regime and conservation or mitigation of flood risk in an affected area. Besides the design of interventions and structures important for HPP operating and other accompanying measures into a considered area, the appropriate operation of an individual HPP and HPPs chain as a whole contributes significantly to achieving the desired goals during high waters. This paper presents an optimization of the HPP chain operation on the section of Sava River between Radeče and state border with the Republic of Croatia. The approximately 60-km long, substantially urbanized section of the Lower Sava, where construction of a chain of six run-of-the-river HPPs is in its finals stages, had to meet a number of requirements to improve or at least conserve the same level of flood risk and run-off regime on the border with the Republic of Croatia, defined by interstate agreement. In order to meet the requirements, we determined a uniform operating procedure of HPP chains during flood events that ensures the conservation of flood-wave characteristics along the chain of HPPs, while meeting the requirements of other stakeholders in this influential area. We showed with hydraulic analysis that the shape of the flood wave and its peak discharge can be conserved, but it is not possible to conserve natural flood-wave propagation time along the chain of HPPs.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.