The Musi Hydroelectric Power Plant area in Kepahiang Regency is a hilly area that has steep slopes that are prone to landslides. One of the landslides that occurred at October 2017 precisely occurred on a highway between Susup Village, Bengkulu Tengah Regency and Ujan Mas District, Kepahiang Regency. This study aims to analyze the slope stability of the terraces using the Fellenius Method. The results of testing the physical properties of the soil indicate that the soil on the slopes of the area of the Musi Hydroelectric Power Plant is clay. The slopes studied in the Musi hydropower area are all prone to landslides because safety factor, FK <1,5. Based on the results of the research on the slopes of the safest type 1 slope the value of the safety factor is the type of slope of the slope trap 3,19o,FK = 1,61 greater than the safety factor value of slope type 2 slope trap 19o, FK = 1,57 and safe slope type safety factor value slope of 19o, FK = 1.519 and the value of the safety factor of the original slope type of slope 30o, FK =0,88.
Bendung Air MusiKejalo has decreased productivity,one of the contributing factors is sedimentation. The purpose of research is to know the massive rate of sediment transport from weir which enter in sand trap using method of Shen and Hungs and Meyer Petter Muller method. Then plot the dimensions of the sludge pouch from the resulting sediment rate.The stages of the research implementation are sediment sample test, flow velocity measurement and channel dimension then calculation and data analysis.The result of calculation using method of Shen and Hungs, got the value of sediment rate discharge at sand trap is 0,1295 ton / day, and by Meyer Petter Muller method equal to 22,4966 ton / day. So the result of sediment rate discharge Meyer Petter Muller method used for planning dimension sand trap of Air Musi Kejalo Weir.Volume of sand trap Air Musi Kejalo Weir is 120 m3. Dimensions of sand trap length 61 m, width 4 m and depth of 1,3 m. The conclusion of this study is that with thedimensions of planned sludge pockets based on the volume of sediment obtained, the sand trap should be rinsed for 14 days once so that the sediment does not accumulate in the sand trap and using a construction is pairs of round stone with type of sand trap is square and type of main drain is trapezoid.
Meningkatnya aktivitas bangkitan pergerakan kendaraan di suatu ruas jalan mencerminkan perkembangan yang terjadi di wilayah tersebut. Aktivitas masyarakat dalam bentuk perjalanan untuk bekerja, dapat mempengaruhi besarnya bangkitan pergerakan. Penelitian ini bertujuan untuk mengetahui faktor-faktor yang berpengaruh terhadap model bangkitan perjalanan bekerja pada Kawasan Perumahan di Kecamatan Muara Bangkahulu. Metode penelitian dengan cara wawancara langsung dalam bentuk kuesioner. Analisis data penelitian menggunakan model regresi linier berganda. Hasil penelitian menunjukkan bahwa model bangkitan perjalanan pada Kawasan Perumahan di Kecamatan Muara Bangkahulu memiliki persamaan y = -0,961 + 0,173 x1 + 0,193 x4 + 1,257 x5, r2 = 0,886 dengan faktor yang mempengaruhi adalah jumlah anggota keluarga (x1), jumlah penghasilan rata-rata keluarga perbulan (x4) dan jumlah anggota keluarga bekerja (x5).
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.