Prepared byStephe;~riebe,~ckbeed Idaho Chris Iachay,h~d Idaho Date Z-1( *95Date EXECUTIVE SUMMARỸ report dmcribes the activity based costing method used to acquire variable (volume dependent or avoidable) waste management wst data for routine operations at Department of Ener~(DOE) facifiti=. Waste volumes horn environmental r=toration, facility stabilization activities, and legacy waste were sp~ifically e.scIuded from this effort. A core team consisting of Idaho National Engin=rirrg Laboratory, Los Alamoa National Laboratory, Rocky Ftats Environmental Technology Site, and Oak Ridge Reservation develo@ and piloted the methodology, which cart be used to determine avoidable waste management rests.The method developed to gather information was based on activity baaed costing, which is a common industrial engineering technique. Sites submitted separate flow diagrams that showed the progrmion of work from activity to activity for each waste type or treatability group. Each activity on a flow diagram was described in a narrative, whwh detailed the scope of the activity. Labor and material coats baaed on a unit quantity of waste being proceaacd were then summed to generate a totai mst for that flow diagram. Cross-complex valuea were calcdated by determining a weighted average for each waste type or trcatability group baaed on the volume generated.'flria study wifl provide DOE and contractors with a better understanding of waste management pr-ea and their associated coats. Other potential benefits incIude providing cost data for sites to perform consistent Coathenefit anal~es of waste minimization and pollution prevention (WMINEP) options identified during pollution prevention opportunity assessments and providing a means for prioritizing and allocating limited reaourfor WMINPP. D-AIMERThis r.porl was wepr.rcd a~an account of work sponmrcd by an agency of the United StatG overnment. N.itb.r the U.itd States Gov.rnme"t nor any ae"cy Ihcrmr, nor any of their employ=, make any warranty, .xpw or implied, or assumes any legal liability or =pnsi-bility fw the accuracy, campleten~, or u~fulnem of any information, apparatus, ptiuct, or pr~discld, or repr-nts that its "% would not infringe privately ownd righti. Reference hemi. to any s~ific commercial product, pro.xss, or xrvicc by trade name, trademark, manufacturer, or otherwise dw not nwssarily m.stitutc or imply its ."do=m.nt, Mmme"datio", or favoring by the Unitd States Govcrnme.t or any agency tbermf.
If this is a satellite storage area, the cost is $0. Otherwise, assume that it takes 5 minutedday to do the inspections, and let's say that the time frame is 90 days, which totals 7.5 hours. Then, $52.30 * 7.5 hr /B7 to get the unit costs.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.