Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
REPORT DATE
AUG 20052. REPORT TYPE
Environmental Assessment
USACE
SPONSOR/MONITOR'S REPORT NUMBER(S)
DISTRIBUTION/AVAILABILITY STATEMENT
Approved for public release; distribution unlimited
SUPPLEMENTARY NOTESThe original document contains color images.
ABSTRACTThis EA describes the potential environmental consequences of five proposed projects within the WINDO at Langley AFB. Projects include the relocation of the government fuel station, alert area expansion, visitors' quarters construction, relocation of the explosive ordnance disposal training range, and construction of parking for WRM and ACCRSS facilities. Ten resource categories received a thorough evaluation to identify potential impacts. An increase to safety risks during demo and construction would be mitigated by employing standard safety practices. Any noise associated with work at these sites would be temporary and limited to daytime hours. These actions would have the potential to disturb portions of various ERP sites; a waiver from ACC would be necessary, which would identify appropriate control measures. These actions would be consistent with the base General Plan, and any transportation impacts resulting from increased truck traffic would be minor. Interruption of utilities and other infrastructure due to demo and construction activities would be temporary. Air Quality, Cultural Resources, Water Resources, Biological Resources, and Socioeconomics would not be significantly affected by this action. No long term environmental consequences are anticipated.
Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.