The major capital costs for MnO 4 injection are associated with injection point installation, reagent purchase and labor during the injection. However, there are a number of other factors that can influence the final project cost including mobilization, setup of injection equipment (e.g. pumps, meters, etc.), injection water supply, and site cleanup. These costs are not closely related to the specific injection design. However, they can have a significant impact on the final project cost. In the design tool, costs for engineering and permitting, mobilization, equipment setup, water supply and cleanup/demobilization are entered as fixed costs.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.