Digital substation concept improves substations in advance by enhancing the equipment at station level, bay level, and process level. This enhancement of substation requires changes of equipment at those levels. The design needs to meet each equipment’s compatibility with the others. However, some manufacturers of the digital substation in Indonesia provide different specifications for the equipment at the same level. This condition causes challenges of implementation design of the digital substation in existing substations. To enhance existing substations including conventional substation and modern substation, the digital substation specification and equipment are reviewed. The reviews are based on digital substation standards including communication protocol, network redundancy, and time synchronization. After the specification study, the provided equipment in Indonesia are compared based on their technical specification. The technical specifications are compared at station level, bay level and process level based on provided equipment in Indonesia. The compatibility study is analyzed by using provided equipment, following with the implementation study in Indonesia. This paper provides reviews of the technical specification gap of existing substations compared to the digital substation. Finally, the consideration of choosing technical specifications also provided when implementing the digital substation in Indonesia.
Pulau Tomia merupakan salah satu pulau di Kabupaten Wakatobi, Provinsi Sulawesi Tenggara yang menggunakan konsep microgrid untuk melistriki masyarakatnya. Konsep microgrid tersebut mengintegrasikan Pembangkit Listrik Tenaga Disel (PLTD) dan Pembangkit Listrik Tenaga Surya (PLTS). Namun, saat ini kondisi sistem PLTS di Pulau Tomia tidak dapat memproduksi listrik karena terjadi permasalahan dan berdampak pada potensi energy not served (ENS) serta kerugian investasi dalam pembangunan sistem microgrid. Dalam makalah ini dijelaskan proses revitalisasi pada sistem PLTS di Pulau Tomia dengan harapan makalah ini dapat menjadi referensi pada proses revitalisasi PLTS di lokasi lainnya. Proses revitalisasi pada PLTS Tomia dilaksanakan melalui beberapa tahapan yaitu review desain eksisting PLTS Tomia, investigasi penyebab gangguan, inisiatif perbaikan, dan desain ulang PLTS Tomia. Dari hasil investigasi gangguan dapat diketahui bahwa penyebab tidak beroperasinya PLTS Tomia adalah gangguan pada rangkaian PLTS, Grid Tied Inverter (GTI), dan elemen penyimpan (baterai). Berdasarkan hasil analisa lebih lanjut, didapatkan inisiatif perbaikan yang dapat ditindaklanjuti dengan hasil terbaik dan cara yang termudah, yaitu melakukan desain ulang pada rangkaian combiner box PLTS dan mengimplementasikan konsep GTI modular. Hal tersebut dilakukan agar keandalan PLTS tetap terjaga jika salah satu GTI mengalami permasalahan. Hasil revitalisasi menunjukkan bahwa nilai kualitas daya berupa harmonisa tegangan dan arus yang dihasilkan oleh GTI telah memenuhi standar. Selain itu, PLTS Tomia hasil revitalisasi mampu menghasilkan potensi penghematan Biaya Pokok Produksi (BPP) Listrik yang semula adalah sebesar Rp. 3080/kWh menjadi Rp. 2983/kWh.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.