We propose a methodology for determination of Allowance Time (AT), based on heart rate and work sampling of a production line composed of thirteen stations operated by four workers. The current production line presents a high rate of personnel turnover and absenteeism and with an AT value established by the company of 6.3%. The AT determination is of critical importance, given that through this the workers need to maintain their work rhythm at 100% during the entire workday without fatigue. The resulting allowance after the study was 15% instead of 6.3%, increasing the standard time and causing a decrease in personnel turnover and absenteeism and consequently increasing the production capacity and the reduction of costs.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.