The paper presents the recent development of marginal oil and gas accumulations in the vicinity of the offshore Hidra field, by Total Austral operator and partners Deminex and Pan American Energy. Lying 12 km off the Coast of Tierra del Fuego in 35 m of water, the Hidra field was originally developed in 1989-1990 with conventional deviated wells drilled from two wellhead platforms, Hidra Centro and Hidra Norte. In 1996, three ER wells were drilled with a jack-up from these platforms to tap the Ara Sur and Hidra Sur accumulations. Although technical difficulties had to be overcome, the project was successfully completed. The first well (HNP-7) reached a horizontal departure of 6.2 km at 1700 m TVD representing more than twice the reach of previous conventional wells. This experience established the feasibility and cost effectiveness of ER wells, as a means of developing marginal oil deposits. Total and its partners decided to launch a second, more ambitious campaign in 1997, in which 9 ER wells were planned to be drilled, this time from the coastline. By May 1998, after a year of operations, 5 wells had been completed including the new American Continent record ER well, AS-3. Drilled late 1997 to a maximum departure of 7973m at a vertical depth of 1615 m, giving a HD/TVD ratio of 4.9, AS-3 was drilled and completed in 90 days. This technical achievement was the reward of intense engineering preparation, proactive attitude on the part of the project team and multidisciplinary teamwork and efficient risk management. The engineering preparatory studies are described, together with the rig mobilization, modifications and drilling operations highlights. A primary consideration of this project is protection of the unspoiled environment at the drilling site. The utter remoteness of the location has added a significant degree of difficulty to an already challenging task. An effort has been made with the mud logging company to improve the monitoring of hole condition, especially during the critical 12 1/4" phase, which reached 6700 m in length, at 80-85 inclination, using a device which measures in real time the total amount of cuttings flowing at the shale shakers. This data is combined with Pressure While Drilling data to further estimate hole cleaning efficiency and ECD. To overcome friction, the 9 5/8" casing of well AS-3 was run to 7720 m MD in flotation, requiring careful engineering and unconventional procedures and equipment. Landing into and drilling through the Springhill reservoir which is only 10 to 20 m thick and can exist locally in lenses, requires delicate geosteering techniques. This paper lists the main challenges that had to be overcome and the techniques employed. An economic comparison with other more conventional development schemes is outlined. The results achieved so far open the way to more ambitious targets which are presently under evaluation. P. 99
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.