The results of system testing against a set of performance criteria indicate the readiness of a new installation for service. In the first installation of TSPS No. 1 at Morristown, N. J., system testing also had to accomplish a design shakedown concurrent with final design and program debugging efforts at the Holmdel laboratory test model. This article describes the overall efforts and test facilities involved in the initial shakedown.
The material contained in this appendix furnishes a guideline for reliability and maintainability of UNICOM and presents some desirable objectives in these areas. It contains definitions of reliability, maintainability, system down time, station down time, error, fault, etc., as they apply to UNICOM. It presents objectives for reliability, fault detection and diagnosis, and repair time. It points out the various factors to be considered in the design of the switching center equipment, including equipment design factors, program design factors, system design factors, and security aspects of maintenance.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.