The framework of this paper is the aerospace industry, which is one of the world’s leading sectors, thus playing a noteworthy role in current society. This makes it especially important to try to optimize the management of the aerospace sector. Therefore, the main objective of this paper is to propose the so-called Enhanced-Earned Value Management (hereinafter, E-EVM) model, able to explore the simultaneous evaluation of many projects, from which the management of the project can take advantage. Additionally, this model considers the possibility of forecasting pending tasks, measurable in time units or cost units, until the end of the project. The main contribution of E-EVM methodology is its capacity to detect both delayed and advanced projects by converting times (hours) into monetary units (EUR). Empirically, this enhanced model has been applied to a real case study in the aerospace industry composed of thousands of subprojects and the results provide the project manager with valuable information to make decisions in a short term. Through computer graphic representation techniques, the visualization of project deployment can be improved. Finally, the E-EVM model can be used even in big projects where a very large volume of information must be simultaneously treated and also, it will be suitable to apply pattern recognition concerning the project performance.
Earned value management (EVM) is an effective project management approach. This method is used to manage project of different sectors and has been revised to improve its schedule estimates, the Earned Schedule Management and the Earned Duration Management and to include new components as quality, the quality earned value management. This paper explores the EVM methodology and proposes a model to manage projects aerospace engineers based in a real case study. The inputs in the model are the planning and the monitoring of the case study, planned value, earned value and actual cost of aerospace projects. Keywords Earned value management • Earned schedule management • Earned duration management • Quality earned value management • Planned value • Earned Value and actual cost • Airspace Earned Value ManagementThe Earned Value Management (EVM) is a robust and effective approach for the performance of the project management. This method integrates scope, cost and time management in a single tool. EVM needs a periodic monitoring of the project
Civil aviation is one of biggest industrial contributors to CO2 emissions worldwide. One of the most urgent problems of this sector is providing new technologies to continue operating in a more sustainable environment through a transition to clean energy. The Earned Value Management (EVM) model, as a traditional project management tool, is continuously being revised with new releases and extensions (e.g., ESM, EDM, QEVM, E-EVM, and ZEVM), but to date none of them has applied an expert judgment criterion to be able to modify and anticipate the final result of the project. In such a way, this paper introduces a novel approach to the topic with the so-called Enhanced and Efficient Earned Value Management (denoted E2-EVM) model by including this new capability through the real options methodology, thus helping to support the sustainability of the aerospace sector. This research focuses on three main goals: the description of recent green initiatives in the aerospace sector by checking its contribution to reaching the well-known Sustainable Development Goals (SDGs), the development of a new version of the EVM model by applying the real options methodology, and, finally, the financial contribution to the aerospace industry by applying these initiatives and methodologies.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.