In this paper, we present an industrial problem found in a company that produces acrylic fibres to be used by the textile industry. The problem is a particular case of the discrete lot sizing and scheduling problem (DLSP). In this problem, lots of similar products must be generated and sequenced in ten unrelated parallel machines, in order to minimize tool changeovers and the quantity of fibre delivered after the required due date. The company problem is original because a changeover can occur between two lots of the same product due to tool wear. We analyse the problem in detail and present an adaptation of a heuristic found in the literature to solve it. Results obtained with the proposed heuristic are compared with results that used to be obtained by the production planner, using historical data. q
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.