Since the beginning of drilling for oil, improving efficiency and reducing the cost of hydrocarbon recovery have been key issues when designing a well. Since then, new methods and techniques have developed the industry. One of the most critical events in the oil and gas industry was the invention of the liner hanger. Since Liner Hangers are utilized as the primary solution to wellbore construction, they have been designed with such requirements in mind. This paper will deliver an insight to an innovation life cycle where a stakeholder collaborated together to successfully deliver, plan and complete the first 15,000 PSI, 400 °F high pressure- high temperature (HPHT) Liner Hanger designed to overcome the operational obstacles that conventional liner hangers have when deployed with Multistage Frac (MSF) completion systems but still allows for successful operations in cemented completions. This liner hanger technology has been run in different parts of the world and has proven since the beginning that with all the features included in the designed stages.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.