The main issues that have been encountered in PT Surya Toto Indonesia is companies do not know how to measure the performance of the production process so as the utilization of resources that will be used isn’t yet to be known with efficiently. The purpose of this case studies is creating a better production processes by proposing a better and systematic scheduling information system. An Object Oriented Analysis and Design method is used to determine system’s requirements and design of the system architecture. Metaheuristic methods such as Discrete algorithms Levy-flight Firefly is used to improve the performance of the Hybrid Flow Shop machine scheduling become more better. Indicators that are used to determine the performance of the scheduling is makespan and lateness. Results from this algorithm is makespan value of 305.27 hours with lateness value of 10.92 which determine that there is no delays in scheduling. Scheduling information system was designed three primary capabilities, which are integrated data management, inventory management and a systematic and accurate scheduling system.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.