In view of certain areas of Guizhou are soft sandstone rock, where single block of rock's hardness is very low and easily crushed, complicated hydrogeology and low level of complex surrounding rock and geological conditions, geological radar prediction is used before the excavation of the tunnel, and New Austrian Tunneling Method was used in the construction. The process of construction segment had been monitored and measured, and the deformation of tunnel had been controlled. According to the situation during excavation and monitoring, the construction method was further improved. Through tracing and monitoring the tunnel construction of from zk40+430 to zk40+630 sections for two months, showed that the tunnel construction method is effective in this paper.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.