Excavators are one of the most energy-intensive elements of earthwork operations. Predicting the energy consumption and CO 2 emissions of excavators is therefore critical in order to mitigate the environmental impact of earthwork operations. However, there is a lack of method for estimating such energy consumption and CO 2 emissions, especially during the early planning stages of these activities. This research proposes a model using an artificial neural network (ANN) to predict an excavator's hourly energy consumption and CO 2 emissions under different site conditions. The proposed ANN model includes five input parameters: digging depth, cycle time, bucket payload, engine horsepower, and load factor. The Caterpillar handbook's data, that included operational characteristics of twenty-five models of excavators, were used to develop the training and testing sets for the ANN model. The proposed ANN models were also designed to identify which factors from all the input parameters have the greatest impact on energy and emissions, based on partitioning weight analysis. The results showed that the proposed ANN models can provide an accurate estimating tool for the early planning stage to predict the energy consumption and CO 2 emissions of excavators. Analyses have revealed that, within all the input parameters, cycle time has the greatest impact on energy consumption and CO 2 emissions. The findings from the research enable the control of crucial factors which significantly impact on energy consumption and CO 2 emissions.
A method has been developed to estimate the environmental impact of wheel loaders used in earthmoving operations. The impact is evaluated in terms of energy use and emissions of air pollutants (CO 2 , CO, NO x , CH 4 , VOC, and PM) based on the fuel consumption per cubic meter of hauled material. In addition, the effects of selected operational factors on emissions during earthmoving activities were investigated to provide better guidance for practitioners during the early planning stage of construction projects. The relationships between six independent parameters relating to wheel loaders and jobsite conditions (namely loader utilization rates, loading time, bucket payload, horsepower, load factor, and server capacity) were analyzed using artificial neural networks, machine performance data from manufacturer's handbooks, and discrete event simulations of selected earthmoving scenarios. A sensitivity analysis showed that the load factor is the largest contributor to air pollutant emissions, and that the best way to minimize environmental impact is to maximize the wheel loaders' effective utilization rates. The new method will enable planners and contractors to accurately assess the environmental impact of wheel loaders and/or hauling activities during earthmoving operations in the early stages of construction projects. Implications: There is an urgent need for effective ways of benchmarking and mitigating emissions due to construction operations, and particularly those due to construction equipment, during the pre-construction phase of construction projects. Artificial Neural Networks (ANN) are shown to be powerful tools for analyzing the complex relationships that determine the environmental impact of construction operations and for developing simple models that can be used in the early stages of project planning to select machine configurations and work plans that minimize emissions and energy consumption. Using such a model, it is shown that the fuel consumption and emissions of wheel loaders are primarily determined by their engine load, utilization rate, and bucket payload. Moreover, project planners can minimize the environmental impact of wheel loader operations by selecting work plans and equipment configurations that minimize wheel loaders' idle time and avoid bucket payloads that exceed the upper limits specified by the equipment manufacturer.
Mass hauling operations play central roles in construction projects. They typically use many haulers that consume large amounts of energy and emit significant quantities of CO 2. However, practical methods for estimating the energy consumption and CO 2 emissions of such operations during the project planning stage are scarce, while most of the previous methods focus on construction stage or after the construction stages which limited the practical adoption of reduction strategy in the early planning phase. This paper presents a detailed model for estimating the energy consumption and CO 2 emissions of mass haulers that integrates the mass hauling plan with a set of predictive equations. The mass hauling plan is generated using a planning program such as DynaRoad in conjunction with data on the productivity of selected haulers and the amount of material to be hauled during cutting, filling, borrowing, and disposal operations. This plan is then used as input for estimating the energy consumption and CO 2 emissions of the selected hauling fleet. The proposed model will help planners to assess the energy and environmental performance of mass hauling plans, and to select hauler and fleet configurations that will minimize these quantities. The model was applied in a case study, demonstrating that it can reliably predict energy consumption, CO 2 emissions, and hauler productivity as functions of the hauling distance for individual haulers and entire hauling fleets.
Meeting increasingly ambitious carbon regulations in the construction industry is particularly challenging for earthmoving operations due to the extensive use of heavy-duty diesel equipment. Better planning of operations and balancing of competing demands linked to environmental concerns, costs, and duration is needed. However, existing approaches (theoretical and practical) rarely address all of these demands simultaneously, and are often limited to parts of the process, such as earth allocation methods or equipment allocation methods based on practitioners’ past experience or goals. Thus, this study proposes a method that can integrate multiple planning techniques to maximize mitigation of project impacts cost-effectively, including the noted approaches together with others developed to facilitate effective decision-making. The model is adapted for planners and contractors to optimize mass flows and allocate earthmoving equipment configurations with respect to tradeoffs between duration, cost, CO2 emissions, and energy use. Three equipment allocation approaches are proposed and demonstrated in a case study. A rule-based approach that allocates equipment configurations according to hauling distances provided the best-performing approach in terms of costs, CO2 emissions, energy use and simplicity (which facilitates practical application at construction sites). The study also indicates that trucks are major contributors to earthmoving operations’ costs and environmental impacts.
Mass hauling operations play central roles in construction projects. They typically use many haulers that consume large amounts of energy and emit significant quantities of CO2. However, practical methods for estimating the energy consumption and CO2 emissions of such operations during project planning are lacking. This paper presents a detailed model for estimating the energy consumption and CO2 emissions of mass haulers that integrates the mass hauling plan with a set of predictive equations. The mass hauling plan is generated using a planning program such as DynaRoad in conjunction with data on the productivity of selected haulers and the amount of material to be hauled during cutting, filling, borrowing, and disposal operations. This plan is then used as input for estimating the energy consumption and CO2 emissions of the selected hauling fleet. The proposed model will help planners to assess the energy and environmental performance of mass hauling plans, and to select hauler and fleet configurations that will minimize these quantities. The model was applied in a case study, demonstrating that it can reliably predict energy consumption, CO2 emissions, and hauler productivity as functions of the hauling distance for individual haulers and entire hauling fleets.
<p>In road construction, large quantities of raw materials are extracted and transported during several stages of its life cycle. Consequently, processing and preparation of raw materials for different purposes inevitably result in considerable amount of energy use and emissions of air pollutants. The Swedish Transportation Administration has an ambition to minimize environmental impacts from transport infrastructure projects by, for instance, reducing the energy use and emissions of greenhouse gases. This can be achieved by implementing specific strategies and techniques during various stages throughout the life cycle of the project. In this paper a framework is proposed to manage the energy use and greenhouse gases emissions from raw materials extraction processes in road construction projects. A prototype is developed based on the framework and demonstrated in a small case study.</p>
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
334 Leonard St
Brooklyn, NY 11211
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.