자동차 차체공장에서 고장분포를 고려한두 종류 배치구조에 대한 비교There are many challenges in manufacturing system for new factory construction. Although factories produce same product, the layout of each factory may be different. The body shop in an automotive factory is a typical flow line with assembly, but the layout concept of the line varies among factories. In this paper, two types of layouts in the body shops of automotive factories, one for layered build and the other for modular build, are compared using simulation study. The simulation experiments indicate that the modular build layout is better than the layered build layout with respect to production rate. The effects of various failure distributions on the throughputs are also investigated, and some insights are suggested regarding the layout concept.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.