This paper addresses the problem of vehicle location (positioning) for automated transport in fully automated manufacturing systems. This study is motivated by the complexity of vehicle control found in modern integrated circuit semiconductor fabrication facilities where the material handling network path is composed of multiple loops interconnected. In order to contribute to decrease the manufacturing lead-time of semiconductor products, we propose an integer linear program that minimizes the maximum time needed to serve a transport request. Computation experiments are based on real-life data. We discuss the practical usefulness of the mathematical model by means of a simulation experiment used to analyze the factory operational behavior.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.