In order to manage engineering projects systematically and efficiently, the process of each project execution should be organically linked. The authors developed E-PMS (Engineering-Project Management System) for the linkage of processes. A tool called DECRIS (Detailed Engineering Completion Rating Index System) was developed to measure the completeness at the detailed design stage and to identify the starting point of construction (Steel Cutting). This helps the EPC contractor carry out the project by analysing the impact on schedules and costs during the engineering phase. Next is the DLDs Analysis. This study analysed the relationship between the results of the catch-up of the construction period and the delay liquidated damages (DLDs) based on limited resources and develops a model that can support the decision on whether to perform catch-up. The validity criterion of the model is that the results of the simulation of schedule shortening do not exceed the full DLDs incurred due to no catch-up plan. The result of the schedule catch-up simulation is the cost, which is the sum of the additional budget for a catch-up and the remaining DLDs. The reason for the validation criteria mentioned above is that the costs incurred for acceleration when excessive construction was performed to comply with the construction period can exceed the full DLDs.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.