Ice is an important part of the Alaska ecosystems and can form through dynamic (e.g., frazil) or static (e.g., thermal) processes. In Alaska, both freeze-up and breakup ice jams occur, however breakup jams during the spring snowmelt period are most common. Historically there have been many river systems in Alaska that have chronic ice jam issues. These ice jams have resulted in several significant ice jam floods. There are ice jam mitigation techniques that can be used to either provide state and local emergency managers warnings of a potential ice jam or reduce the impacts of a jam. Common relatively low-cost mitigation methods that can be implemented prior to a jam forming are monitoring and detection of movement, mechanical or thermal weakening of the ice cover. Permanent measures are also effective and maybe the best option in specific locations. These measures include structures to keep flood waters from inundating areas (e.g., levee) or they can be designed to hold back ice fragments moving downstream (e.g., ice boom and pier structures). Climate change impacts to ice processes are important for Alaska and additional investigations will be needed to quantify the ecologic, hydrologic, and societal impacts.
Ground anchors connected to guy wires for tower structures in cold climates suffer from frost heaving, which causes loss of wire tension and subsequent structural instability. It is necessary to understand what ground anchors are available to resist this tendency yet are still capable of expedient installation in remote areas. To that end, three metal, traditional ground-anchor types (arrowhead, bullet, and penetrating auger) and one novel polyvinyl chloride (PVC) T-post anchor were evaluated in frozen gravels and frozen silts at a research facility in Fairbanks, Alaska. Criteria included installation capability, failure loading, and removal ability. Additionally, expedient installation techniques for use in field conditions were also demonstrated. All three traditional ground anchors failed to penetrate frozen gravels. The penetrating auger also failed to penetrate frozen silts, but the arrowhead and bullet anchors did penetrate frozen silts with difficulty. The PVC anchor is capable of being installed only in a predrilled pilot hole. Under flexural load, the arrowhead anchor cable failed at 3686.72 lb, and the bullet anchor cable failed at 1753.44 lb. The PVC slid out of its hole at a direct-pull force of 1978.24 lb and failed under flexural stress at 202.32 lb.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.