The Stanford Linear Accelerator Center (SLAC) klystron group is currently designing, fabricating and testing 11.424 GHz klystrons with peak output powers from 50 to 75 MW at 1 to 2 µs rf pulsewidths as part of an effort to realize components necessary for the construction of the Next Linear Collider (NLC). In order to eliminate the projected operational-year energy bill for klystron solenoids, Periodic Permanent Magnet (PPM) focusing has been employed on our latest X-band klystron designs. A PPM beam tester has operated at the same repetition rate, voltage and average beam power required for a 75 MW NLC klystron. Prototype 50 and 75 MW PPM klystrons were built and tested during 1996 and 1997 which operate from 50 to 70 MW at efficiencies greater than 55 %. Construction and testing of 75 MW research klystrons will continue while the design and reliability is perfected. This paper will discuss the design of these PPM klystrons and the results of testing to date along with future plans for the development of a low-cost Design for Manufacture (DFM) 75 MW klystron and invitation for industry participation.
No abstract
X-band klystrons capable of 75 MW and utilizing either solenoidal or Periodic Permanent Magnet (PPM) focusing are undergoing design, fabrication and testing at the Stanford Linear Accelerator Center (SLAC). The klystron development is part of an effort to realize components necessary for the construction of the Next Linear Collider (NLC). SLAC has completed a solenoidal-focused X-band klystron development effort to study the design and operation of tubes with beam microperveances of 1 .2. As of early 2000, nine 1.2 .tK klystrons have been tested to 50 MW at 1.5 j.ts. The first 50 MW PPM klystron, constructed in 1996, was designed with a 0.6 p.K beam at 465 kV and uses a 5-cell traveling-wave output structure. Recent testing of this tube at wider pulsewidths has reached 50 MW at 55 % efficiency, 2.4 ts and 60 Hz. A 75 MW PPM klystron prototype was constructed in 1998 and has reached the NLC design target of 75 MW at 1 .5 ps. A new 75 MW PPM klystron design, which is aimed at reducing the cost and increasing the reliability of multi-megawatt PPM klystrons, is under investigation. The tube is scheduled for testing during early 2001.
75 MW X-band klystrons utilizing Periodic Permanent Magnet (PPM) focusing have been undergoing design, fabrication and testing at the Stanford Linear Accelerator Center (SLAC) for almost nine years. The klystron development has been geared toward realizing the necessary components for the construction of the Next Linear Collider (NLC). The PPM devices built to date which fit this class of operation consist of a variety of 50 MW and 75 MW devices constructed by SLAC, KEK (Tsukuba, Japan ) and industry. All these tubes follow from the successful SLAC design of a 50 MW PPM klystron in 1996. In 2004 the latest two klystrons were constructed and tested with preliminary results reported at EPAC2004. The first of these two devices was tested to the full NLC specifications of 75 MW, 1.6 microseconds pulse length, and 120 Hz. This 14.4 kW average power operation came with a tube efficiency >50%. The most recent testing of these last two devices will be presented here. Design and manufacturing issues of the latest klystron, due to be tested by the Fall of 2005, are also discussed.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.