With the construction of a new power system, a variety of new loads are incorporated into the system, and the new power system grows rapidly, resulting in line blockage, off-peak power consumption, and unbalanced power flow during accident maintenance and repair. With the retaliatory increase of load in the new epidemic period, through the evaluation of the dynamic load level of the power supply circuit, we should study how to determine the load bottleneck equipment, and reasonably explore the power load potential of the existing equipment under various working conditions, so as to increase the power supply circuit. The observability and controllability of the equipment, improving the reliability of equipment operation, and rationally arranging the power outage plan to maximize the power supply level, new energy consumption level and equipment benefit of the equipment have become important in the management of new power systems that cannot be ignored. At the same time, it is also the most urgent practical need for the management of new energy installations.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.