This paper proposes a revised cost-benefit algorithm for solving the expediting completion time of end product (ECTEP) problem with defective components/materials in the product structure diagram. The existing cost-benefit ECTEP algorithm assumes that all materials produced or purchased are of perfect quality. However, the procurement of defective materials in a real-life situation is inevitable. This study extends the algorithm to take imperfect-quality component parts into consideration. Adjusted unit procurement cost and adjusted required quantity are incorporated to address the issue of defective materials procured. Both random and stationary imperfect quality rates are examined. The critical path method and time-costing method are utilized in the proposed solution procedures for finding the optimal material procurement alternatives that minimize the end product unit manufacturing cost (including compensatory cost for defective materials) as well as expediting its total completion time. A numerical example is provided to demonstrate its practical usage.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.