Tunnelling-induced ground surface settlement prediction still adopts empirical and analytical approaches; thus a step further in using a practical numerical analysis is now a challenging task. Because the deformation during tunnelling is a three-dimensional problem, several features were incorporated in two-dimensional analyses to capture aspects that are important in governing behaviour in the missing third dimension. This paper aims to present simplified methods for ground settlement computation of tunnelling works using the PLAXIS finite-element programme. Three simplified methods – contraction ratio, stress reduction and modified grout pressure – were considered in this study. Practical application requires correlations among these three methods. Such correlations among the three methods are proposed in this study and can be used in geotechnical practice. The results were based on a series of finite-element analyses of the Blue Line Bangkok Mass Rapid Transit tunnels. The geotechnical parameters were selected based on soil investigation reports carried out for construction purposes. The soil constitutive model adopted herein was the hardening soil model on soft and stiff clays. All the finite-element simulations were compared with the measured field deformations. Therefore, the analysis results can be considered as a Class-C prediction (back-analysis).
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.