With tunnel boring machines (TBMs) widely used in tunnel construction, the adaptable adjustment of TBM operating status has become a research focus. Since the prediction of tunnel geological conditions is still challenging before excavating, the prediction of important TBM operating parameters plays an important role in the research on TBM adaptable adjustment. This paper proposes an intelligent prediction method of TBM tunneling parameters based on bidirectional gate recurrent unit incorporating attention mechanism (Bi-GRU-ATT) and selects a complete tunneling cycle to predict the tunneling parameters of the TBM complete tunneling cycle. Relying on the TBM3 bid section of Jilin Water Supply Project, 21 key parameters of the complete tunneling cycle are selected as the input features of the model to realize the prediction of four tunneling parameters in the complete driving cycle section of TBM. Compared with the Bi-GRU, GRU, and Long Short-Term Memory (LSTM) models, it can be seen that the Bi-GRU-ATT model has a goodness of fit for predicting TBM tunneling parameters above 0.92, and the average absolute percentage error is less than 1.8%. The results show that the prediction method of TBM tunneling parameters based on Bi-GRU-ATT model proposed in this paper has stronger learning and prediction capabilities. This prediction method provides a more feasible auxiliary intelligent decision-making method for TBM aided intelligent construction.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.