Exploring supercritical fluids and investigations of their characteristics for geothermal use requires risk minimization similar to those in oil and gas applications. The geothermal operating company leading the DESCRAMBLE (DESCRAMBLE 2018) project consortium within the European Union's (EU) research and innovation programme Horizon 2020, requested a tailored cement slurry suitable as a dependable long-term barrier and appropriate cementing practices which suit the targeted K-horizon's expected supercritical conditions. A scouting study was performed testing two different Portland-cement silica flour blends under targeted conditions. Additionally, a blend comprising calcium aluminate phosphate cement was selected for this test series. Non-Portland slurry designs have been used in high-temperature geothermal wells (Berard, 2009) as well as in steam injection applications (Li, 2016). Because of testing equipment limitations, samples were cured at 200°C/206 bar and then heated to 450°C at ambient pressure during the scouting phase. The non-Portland design proved to be the best candidate, although all three cement designs showed cracking. As a result, it was decided to further improve the non-Portland cement's mechanical properties by adding modifiers that would not affect the high-temperature rating of the cement. During the second phase, it was also necessary to consider the operational side of slurry design, as placement temperature was 200 °C with a requirement of more than 5 hours thickening time, which is near the upper limit for a non-Portland cement blend. Additionally, testing conditions were ramped up close to supercritical conditions during initial curing, and samples then underwent further curing at 550 °C and ambient pressure. Tri-axial mechanical properties were evaluated after cooldown. From an operational aspect, it became apparent during lab testing that mixing order was important as well as extended temperature simulation to help ensure the well was properly cooled down before cement placement. Once all laboratory testing, simulations, and operational preparations were complete the actual 7-inch liner cementing operation was performed with the desired results. Use of a specially modified calcium aluminate phosphate cement blend was successful and initial results from the well showed that this cement system was properly tailored to the geothermal well conditions. Only a few geothermal wells have been attempted previously under such conditions, hence it was necessary to create and deliver a modified cement slurry design for both geothermal and oil and gas applications. Further monitoring of the cement sheath will be conducted to evaluate long-term properties.
Sound wellbore construction and maintenance are essential to the successful development and production of hydrocarbons from unconventional resources. During the development of a Polish shale play near the Ukrainian border, the integrity of a well under construction became compromised resulting from a breach in an external casing packer on the production string. Successful completion of this well could require fracture-stimulation operations at pressures up to 9,000 psi, which would be impossible, unless the breach could be repaired. A cementing valve just above the breached packer had already reduced the inside diameter (ID) of the 4 1/2-in. production string to 3.827 in. The difficulty of running a casing patch in this restricted environment and the further diameter reductions eliminated this option from being a preferred solution. In addition, the high pressures associated with fracturing operations warranted an innovative solution, rather than a conventional approach. Recently commercialized resins have displayed the ability to withstand stresses higher than 10,000 psi and compressive strains greater than 40% without failure. However, case histories on field deployment of these materials, their ability to be drilled, and performance after hydraulic fracturing were essentially non-existent. This paper presents a case history on the laboratory development of a customized resin solution, the rigless operation using coiled tubing (CT) to place the materials and repair the breached packer, and the drillout after placement. Effectiveness of the remedial operation was determined by subsequent pressure testing. After restoring wellbore integrity, hydraulic fracturing operations were completed and successful production from this well began.
Dedicated to Prof. Dr. rer. nat. Ju ¨rgen Caro on the occasion of his 70th birthdayThe oil industry uses Portland cement in their wells, which is manufactured predominantly in accordance with American Petroleum Institute classifications. Also, cements following standards applied in civil/construction engineering are used, which gain importance recently. A field case is reviewed where a cement plug job was performed across the Zechstein formation of a well in a Rotliegend Group and chemical interactions between the cement slurry and a geological formation could be observed. Furthermore, examples for methods to characterize the porosity of the dry cement powder are referenced.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.