This study, called APEX, is exploring novel concepts for fusion chamber technology that can substantially improve the attractiveness of fusion energy systems. The emphasis of the study is on fundamental understanding and advancing the underlying engineering sciences, integration of the physics and engineering requirements, and enhancing innovation for the chamber technology components surrounding the plasma. The chamber technology goals in APEX include: (1) high power density capability with neutron wall load \ 10 MW/m 2 and surface heat flux \ 2 MW/m 2 , (2) high power conversion efficiency ( \ 40%), (3) high availability, and (4) simple technological and material constraints. Two classes of innovative concepts have emerged that offer great promise and deserve further (2001) 181-247 182 research and development. The first class seeks to eliminate the solid ''bare'' first wall by flowing liquids facing the plasma. This liquid wall idea evolved during the APEX study into a number of concepts based on: (a) using liquid metals (Li or Sn-Li) or a molten salt (Flibe) as the working liquid, (b) utilizing electromagnetic, inertial and/or other types of forces to restrain the liquid against a backing wall and control the hydrodynamic flow configurations, and (c) employing a thin ( 2 cm) or thick ( 40 cm) liquid layer to remove the surface heat flux and attenuate the neutrons. These liquid wall concepts have some common features but also have widely different issues and merits. Some of the attractive features of liquid walls include the potential for: (1) high power density capability; (2) higher plasma b and stable physics regimes if liquid metals are used; (3) increased disruption survivability; (4) reduced volume of radioactive waste; (5) reduced radiation damage in structural materials; and (6) higher availability. Analyses show that not all of these potential advantages may be realized simultaneously in a single concept. However, the realization of only a subset of these advantages will result in remarkable progress toward attractive fusion energy systems. Of the many scientific and engineering issues for liquid walls, the most important are: (1) plasma-liquid interactions including both plasma-liquid surface and liquid wall-bulk plasma interactions; (2) hydrodynamic flow configuration control in complex geometries including penetrations; and (3) heat transfer at free surface and temperature control. The second class of concepts focuses on ideas for extending the capabilities, particularly the power density and operating temperature limits, of solid first walls. The most promising idea, called EVOLVE, is based on the use of a high-temperature refractory alloy (e.g. W -5% Re) with an innovative cooling scheme based on the use of the heat of vaporization of lithium. Calculations show that an evaporative system with Li at 1 200°C can remove the goal heat loads and result in a high power conversion efficiency. The vapor operating pressure is low, resulting in a very low operating stress in the structure. In ad...
a b s t r a c tThe breeding blanket with integrated first wall (FW) is the key nuclear component for power extraction, tritium fuel sustainability, and radiation shielding in fusion reactors. The ITER device will address plasma burn physics and plasma support technology, but it does not have a breeding blanket. Current activities to develop "roadmaps" for realizing fusion power recognize the blanket/FW as one of the principal remaining challenges. Therefore, a central element of the current planning activities is focused on the question: what are the research and major facilities required to develop the blanket/FW to a level which enables the design, construction and successful operation of a fusion DEMO? The principal challenges in the development of the blanket/FW are: (1) the Fusion Nuclear Environment -a multiple-field environment (neutrons, heat/particle fluxes, magnetic field, etc.) with high magnitudes and steep gradients and transients; (2) Nuclear Heating in a large volume with sharp gradients -the nuclear heating drives most blanket phenomena, but accurate simulation of this nuclear heating can be done only in a DT-plasma based facility; and (3) Complex Configuration with blanket/first wall/divertor inside the vacuum vessel -the consequence is low fault tolerance and long repair/replacement time.These blanket/FW development challenges result in critical consequences: (a) non-fusion facilities (laboratory experiments) need to be substantial to simulate multiple fields/multiple effects and must be accompanied by extensive modeling; (b) results from non-fusion facilities will be limited and will not fully resolve key technical issues. A DT-plasma based fusion nuclear science facility (FNSF) is required to perform "multiple effects" and "integrated" experiments in the fusion nuclear environment; and (c) the Reliability/Availability/Maintainability/Inspectability (RAMI) of fusion nuclear components is a major challenge and is one of the primary reasons why the blanket/FW will pace fusion development toward a DEMO.This paper summarizes the top technical issues and elucidates the primary challenges in developing the blanket/first wall and identifies the key R&D needs in non-fusion and fusion facilities on the path to DEMO.Published by Elsevier B.V. This is an open access article under the CC BY-NC-ND license (http:// creativecommons.org/licenses/by-nc-nd/4.0/).
The tritium aspects of the DT fuel cycle embody some of the most challenging feasibility and attractiveness issues in the development of fusion systems. The review and analyses in this paper provide important information to understand and quantify these challenges and to define the phase space of plasma physics and fusion technology parameters and features that must guide a serious R&D in the world fusion program. We focus in particular on components, issues and R&D necessary to satisfy three ‘principal requirements’: (1) achieving tritium self-sufficiency within the fusion system, (2) providing a tritium inventory for the initial start-up of a fusion facility, and (3) managing the safety and biological hazards of tritium. A primary conclusion is that the physics and technology state-of-the-art will not enable DEMO and future power plants to satisfy these principal requirements. We quantify goals and define specific areas and ideas for physics and technology R&D to meet these requirements. A powerful fuel cycle dynamics model was developed to calculate time-dependent tritium inventories and flow rates in all parts and components of the fuel cycle for different ranges of parameters and physics and technology conditions. Dynamics modeling analyses show that the key parameters affecting tritium inventories, tritium start-up inventory, and tritium self-sufficiency are the tritium burn fraction in the plasma (f b), fueling efficiency (η f), processing time of plasma exhaust in the inner fuel cycle (t p), reactor availability factor (AF), reserve time (t r) which determines the reserve tritium inventory needed in the storage system in order to keep the plant operational for time t r in case of any malfunction of any part of the tritium processing system, and the doubling time (t d). Results show that η f f b > 2% and processing time of 1–4 h are required to achieve tritium self-sufficiency with reasonable confidence. For η f f b = 2% and processing time of 4 h, the tritium start-up inventory required for a 3 GW fusion reactor is ∼11 kg, while it is <5 kg if η f f b = 5% and the processing time is 1 h. To achieve these stringent requirements, a serious R&D program in physics and technology is necessary. The EU-DEMO direct internal recycling concept that carries fuel directly from the plasma exhaust gas to the fueling systems without going through the isotope separation system reduces the overall processing time and tritium inventories and has positive effects on the required tritium breeding ratio (TBRR). A significant finding is the strong dependence of tritium self-sufficiency on the reactor availability factor. Simulations show that tritium self-sufficiency is: impossible if AF < 10% for any η f f b, possible if AF > 30% and 1% ⩽ η f f b ⩽ 2%, and achievable with reasonable confidence if AF > 50% and η f f b > 2%. These results are of particular concern in light of the low availability factor predicted for the near-term plasma-based experimental facilities (e.g. FNSF, VNS, CTF), and can have repercussions on tritium economy in DEMO reactors as well, unless significant advancements in RAMI are made. There is a linear dependency between the tritium start-up inventory and the fusion power. The required tritium start-up inventory for a fusion facility of 100 MW fusion power is as small as 1 kg. Since fusion power plants will have large powers for better economics, it is important to maintain a ‘reserve’ tritium inventory in the tritium storage system to continue to fuel the plasma and avoid plant shutdown in case of malfunctions of some parts of the tritium processing lines. But our results show that a reserve time as short as 24 h leads to unacceptable reserve and start-up inventory requirements. Therefore, high reliability and fast maintainability of all components in the fuel cycle are necessary in order to avoid the need for storing reserve tritium inventory sufficient for continued fusion facility operation for more than a few hours. The physics aspects of plasma fueling, tritium burn fraction, and particle and power exhaust are highly interrelated and complex, and predictions for DEMO and power reactors are highly uncertain because of lack of experiments with burning plasma. Fueling by pellet injection on the high field side of tokamak has evolved to be the preferred method to fuel a burning plasma. Extrapolation from the DIII-D penetration scaling shows fueling efficiency expected in DEMO to be <25%, but such extrapolations are highly uncertain. The fueling efficiency of gas in a reactor relevant regime is expected to be extremely poor and not very useful for getting tritium into the core plasma efficiently. Gas fueling will nonetheless be useful for feedback control of the divertor operating parameters. Extensive modeling has been carried out to predict burn fraction, fueling requirements, and fueling efficiency for ITER, DEMO, and beyond. The fueling rate required to operate Q = 10 ITER plasmas in order to provide the required core fueling, helium exhaust and radiative divertor plasma conditions for acceptable divertor power loads was calculated. If this fueling is performed with a 50–50 DT mix, the tritium burn fraction in ITER would be ∼0.36%, which is too low to satisfy the self-sufficiency conditions derived from the dynamics modeling for fusion reactors. Extrapolation to DEMO using this approach would also yield similarly low burn fraction. Extensive analysis presented shows that specific features of edge neutral dynamics in ITER and fusion reactors, which are different from present experiments, open possibilities for optimization of tritium fueling and thus to improve the burn fraction. Using only tritium in pellet fueling of the plasma core, and only deuterium for edge density, divertor power load and ELM control results in significant increase of the burn fraction to 1.8–3.6%. These estimates are performed with physics models whose results cannot be fully validated for ITER and DEMO plasma conditions since these cannot be achieved in present tokamak experiments. Thus, several uncertainties remain regarding particle transport and scenario requirements in ITER and DEMO. The safety standard requirements for protection of the public and release guidelines for tritium have been reviewed. General safety approaches including minimizing tritium inventories, reducing tritium permeation through materials, and decontaminating material for waste disposal have been suggested.
The development of tritium breeder, neutron multiplier and flow channel insert materials for the breeding blanket of the DEMO reactor is reviewed. Present emphasis is on the ITER test blanket module (TBM); lithium metatitanate (Li 2 TiO 3 ) and lithium orthosilicate (Li 4 SiO 4 ) pebbles have been developed by leading TBM parties. Beryllium pebbles have been selected as the neutron multiplier. Good progress has been made in their fabrication; however, verification of the design by experiments is in the planning stage. Irradiation data are also limited, but the decrease in thermal conductivity of beryllium due to irradiation followed by swelling is a concern. Tests at ITER are regarded as a major milestone. For the DEMO reactor, improvement of the breeder has been attempted to obtain a higher lithium content, and Be 12 Ti and other beryllide intermetallic compounds that have superior chemical stability have been studied. LiPb eutectic has been considered as a DEMO blanket in the liquid breeder option and is used as a coolant to achieve a higher outlet temperature; a SiC flow channel insert is used to prevent magnetohydrodynamic pressure drop and corrosion. A significant technical gap between ITER TBM and DEMO is recognized, and the world fusion community is working on ITER TBM and DEMO blanket development in parallel.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.