FIGURE 1: Completion schematic.2. Coiled Tubing (CT) conveyed operation.3 Hydraulic Workover Unit (HWU) conveyed operation.Coiled tubing was considered, but simulation runs showed that the full wellbore could not be accessed with CT and the length of any gun section to be run would be severely limited.Effectively only two options remained: Journal of Canadian Petroleum Technology FIGURE 6: Gun/liner clearance. FIGURE 7: Well performance with and without guns left in the horizontal section.
This paper was prepared for presentation at the 1998 SPE International Conference on Horizontal Well Technology held in Calgary, Alberta, Canada, 1-4 November 1998.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.