TX 75083-3836, U.S.A., fax 01-972-952-9435. AbstractA Dutch onshore gas well was drilled to a total depth of 5136m along hole (3700m true vertical depth) with a maximum deviation of 89 degrees. The well was completed with 7 5/8" 13 Cr tubing with a 7" cemented liner across the reservoir providing full bore access to the pay zone. Due to the very stratified nature of the reservoir the long term sustained production depended on achieving vertical connectivity with all the layers. In order to achieve this and to maximise productivity a 1 run underbalanced perforating operation was required. Due to coiled tubing limitations in this deep, high pressure well a Hydraulic Workover Unit was selected to deploy and retrieve the guns. A total gross interval of 1026 metres was perforated in one run utilising 3 3/8" deep penetrating guns and thereafter snubbed from the well under live conditions (460 bar at surface). To date it is understood that this is the longest section of guns conveyed, fired underbalanced and deployed out of a live well. This paper addresses the perforating technique selection, the planning and execution process, the major operational learning points and discusses final productivity results which demonstrate the validity of this technique.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.