Crossing the volatile River Nith at Portrack in Dumfriesshire has presented railway engineers with severe problems for over 150 years, at least one previous attempt having been destroyed in a flood. Despite ongoing maintenance and repairs, the existing 11 span wrought iron structure, which carries the increasingly important Glasgow and South West Scotland line over the river, needed urgent replacement to reduce long-term costs and improve the safety and efficiency of the route. Carillion Rail and Scott Wilson Scotland carefully evaluated a number of options before recommending a realignment of the railway, which involved the replacement of two viaducts. Working in an environmentally sensitive location, adjacent to a ‘live’ railway and to a tight deadline required a tremendous amount of planning, cooperation and ingenuity by all parties; even the local estate owner became the project's architectural advisor. The centre-piece of the scheme is a spectacular 90 m curved truss-girder crossing the river, which was erected using the world's largest mobile crane. The meticulous planning and teamwork paid off with the construction of the entire project being completed on time, within budget and without disruption to the railway.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.