2018 IEEE International Conference on High Voltage Engineering and Application (ICHVE) 2018
DOI: 10.1109/ichve.2018.8642102
|View full text |Cite
|
Sign up to set email alerts
|

Zero missing effect transient analysis on the 150 kV AC interconnection between Crete and Peloponnese

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2020
2020
2021
2021

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…The project also constitutes the deepest (1 km maximum depth) HV interconnection in the world using a three-core cable with cross-linked polyethylene (XLPE) insulation. In addition, significant innovations in the cable design (lighter and stronger) as well as in its laying have been applied [18][19][20][21]. Moreover, the operation of parallel HVAC and HVDC interconnectors in Crete needs a special control and protection strategy [22][23][24][25].…”
mentioning
confidence: 99%
“…The project also constitutes the deepest (1 km maximum depth) HV interconnection in the world using a three-core cable with cross-linked polyethylene (XLPE) insulation. In addition, significant innovations in the cable design (lighter and stronger) as well as in its laying have been applied [18][19][20][21]. Moreover, the operation of parallel HVAC and HVDC interconnectors in Crete needs a special control and protection strategy [22][23][24][25].…”
mentioning
confidence: 99%