Yard crane scheduling problem in a container terminal considering risk caused by uncertainty

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
22
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 63 publications
(27 citation statements)
references
References 34 publications
0
22
0
Order By: Relevance
“…Considering the uncertainty of vessel arrivals and the fluctuation in the container handling rate of quay cranes, Iris et al (2019) developed a recoverable robust optimization approach for the weekly berth and quay crane planning problem and suggested a proactive baseline schedule with reactive recovery costs [14]. Considering uncertainty and traffic congestion, He et al (2019) not only optimized the efficiency of YC operations, but also optimized the extra loss caused by uncertainty for reducing risk of adjusting schedule as the result of the task groups' arriving times and handling volumes deviating from their plan [1]. Up to present, most of literatures about uncertain HCS in container ports have been modeled from an operations research viewpoint.…”
Section: A Literature Reviewmentioning
confidence: 99%
See 2 more Smart Citations
“…Considering the uncertainty of vessel arrivals and the fluctuation in the container handling rate of quay cranes, Iris et al (2019) developed a recoverable robust optimization approach for the weekly berth and quay crane planning problem and suggested a proactive baseline schedule with reactive recovery costs [14]. Considering uncertainty and traffic congestion, He et al (2019) not only optimized the efficiency of YC operations, but also optimized the extra loss caused by uncertainty for reducing risk of adjusting schedule as the result of the task groups' arriving times and handling volumes deviating from their plan [1]. Up to present, most of literatures about uncertain HCS in container ports have been modeled from an operations research viewpoint.…”
Section: A Literature Reviewmentioning
confidence: 99%
“…The ranges of T F , T U and T I are [3,30], [0. 1,7] and (0,1], respectively. In QSMC and ISMC, the exponential reaching law in (10) is employed and the saturation function is used to replace sign function to reduce chattering.…”
Section: B Power Integral Reaching Lawmentioning
confidence: 99%
See 1 more Smart Citation
“…Zheng et al [56] incorporate reshuffling jobs and yard cranes' interference into a twin yard cranes scheduling problem. He et al [57] address a yard crane scheduling problem with uncertainty and reduce the completion time.…”
Section: Yard Crane Job Schedulingmentioning
confidence: 99%
“…Heuristic methods are the most applied approaches, represented by 82 publications. A total of 30 papers have addressed the evolutionary algorithms, where most of them used theGA (Choe et al 2016;He et al 2019a).…”
mentioning
confidence: 99%