X-ray facility for the characterization of the Athena mirror modules at the ALBA synchrotron

Abstract: The ALBA synchrotron 1 (Barcelona, Spain) is building MINERVA a new X-ray beamline designed to support the development of the ATHENA mission (Advanced Telescope for High Energy Astrophysics). The beamline design is originally based on the monochromatic pencil beam XPBF 2.0 2 at the Physikalisch-Technische Bundesanstalt (PTB), at BESSY II. MINERVA will provide metrology capabilities to integrate stacks produced by cosine company into a mirror module (MM) and characterize them. It will provide photons with a fix… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4
2

Relationship

1
5

Authors

Journals

citations
Cited by 11 publications
(10 citation statements)
references
References 3 publications
0
8
0
Order By: Relevance
“…In view of the criticality of the mirror module assembly during the implementation phase, and considering the complexity of a synchrotron facility, an additional beamline is being built at the ALBA facility near Barcelona in Spain [36].…”
Section: Status Of Developmentsmentioning
confidence: 99%
“…In view of the criticality of the mirror module assembly during the implementation phase, and considering the complexity of a synchrotron facility, an additional beamline is being built at the ALBA facility near Barcelona in Spain [36].…”
Section: Status Of Developmentsmentioning
confidence: 99%
“…One additional limit so far was the availability of the BESSY II synchrotron radiation facility, which is not continuously available due to machine shifts, shutdown times and special operation weeks. To de-risk having only one facility and to increase the available beam time, ESA has invested into the development of a new x-ray beamline, called MINERVA [24], at the ALBA synchrotron near Barcelona in Spain. The beamline is currently being assembled and we expect first light early 2023.…”
Section: Completing the Spo Production Chainmentioning
confidence: 99%
“…Currently this is done at the X-ray Parallel Beam Facility 2 (XPBF 2) synchrotron beamline, which is installed in the laboratory of the Physikalisch-Technische Bundesanstalt (PTB) at the synchrotron radiation facility BESSY II in Berlin [29]. An additional beamline is planned to become operational in 2022 at the ALBA synchrotron facility in Barcelona [31]. The XPBF 2, tailored for the development of Athena's MMs, provides a 1-keV beam monochromatized and collimated by a toroidal mirror with multilayer coating, allowing beam dimensions between 0.05×0.05 mm 2 and 7×7 mm 2 .…”
Section: Mirror Modulesmentioning
confidence: 99%
“…[59]. At the time of writing, two dedicated beamlines are available in the PTB laboratory at the BESSY II synchrotron [37,38], and an additional beamline is being assembled at ALBA [31] (Section 4.5).…”
Section: Spo Stack Characterizationmentioning
confidence: 99%