All Days 2012
DOI: 10.2118/153090-ms
|View full text |Cite
|
Sign up to set email alerts
|

Workover and Completion Operations in East Java Sour Gas Field, Indonesia

Abstract: Nowadays many exploration and production companies have high interest in producing deep, high pressure gas reservoirs that contain sour gas. Carbonates in East Java, Indonesia faced challenges related to workover and completion operations that are prone to kick-loss cycles based on the drilling experiences.The presence of hydrogen sulfide (H 2 S) and carbon dioxide (CO 2 ) in the formation made the completion operation dangerous and difficult to be carried out in the field where is adjacent to a populated area… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
1
0
2

Year Published

2013
2013
2021
2021

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(3 citation statements)
references
References 6 publications
0
1
0
2
Order By: Relevance
“…Its greater purpose is to address the challenges created by wellbore environments. These challenges Include deploying tools at the surface, overcoming frictional forces, maneuvering past obstacles, and adapting to unforeseen downhole conditions [5]. Conveyance methods can be grouped into two basic types: cable conveyed and pipe conveyed.…”
Section: Cement Bond Logmentioning
confidence: 99%
“…Its greater purpose is to address the challenges created by wellbore environments. These challenges Include deploying tools at the surface, overcoming frictional forces, maneuvering past obstacles, and adapting to unforeseen downhole conditions [5]. Conveyance methods can be grouped into two basic types: cable conveyed and pipe conveyed.…”
Section: Cement Bond Logmentioning
confidence: 99%
“…Jenis gas asam atau sour gas ini memiliki efek dan bahaya terhadap lingkungan yang perlu diberikan perhatian dan perlakuan khusus, mengingat sour gas memiliki kandungan hydrogen sulfide (H2S), carbon dioxide (CO2) yang cukup tinggi. Kondisi sour gas perlu dipertimbangkan dalam desain komplesi dan desain operasi komplesi yang aman dan tepat untuk menghindari bahaya kandungan sour gas tersebut (Haris, A., et al, 2012). Desain komplesi secara konseptual bertujuan untuk memastikan semua parameter baik parameter sumuran, kondisi fluida yang mengalir terhadap kemungkinan korosifitas, pH lingkungan sumur, lingkungan sekitar sumur menjadi − 2 − pertimbangan jika terjadi kegagalan desain dan tentunya keekonomian dari sumur tersebut (NORSOK M-001, Rev 3, 2002).…”
Section: Pendahuluanunclassified
“…Semakin tua suatu lapangan migas, umumnya akan terjadi peningkatan kepadatan penduduk disekitar lokasi sumur, semakin sulitnya akses ke lokasi sumur yang semakin padat, dan semakin terbatasnya buffer zone di sekitar lokasi sumur, dan lainnya. Berbagai hal tersebut menambah kompleksitas operasi sumur, kerja ulang (Haris, A., et al, 2012) dan tentunya abandonment pada akhir usia sumur.…”
Section: Pendahuluanunclassified