2012 Sixth IEEE/PES Transmission and Distribution: Latin America Conference and Exposition (T&D-La) 2012
DOI: 10.1109/tdc-la.2012.6319120
|View full text |Cite
|
Sign up to set email alerts
|

Wind farm interconnection analysis: A case study

Abstract: This paper presents the steady state analysis of the interconnection of a large Wind Farm (400 MW) to the Brazilian National Grid. Several contingency cases have been simulated to ensure the n-1 reliability standard. Different connection points are analyzed and an economic assessment is developed. All simulations considered the 2015 scenario, when the wind farm should start generation.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 1 publication
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?