2014 IEEE PES General Meeting | Conference &Amp; Exposition 2014
DOI: 10.1109/pesgm.2014.6939186
|View full text |Cite
|
Sign up to set email alerts
|

Wide area synchronized HVDC measurement using IEC 61850 communication

Abstract: HVDC-Technology is assuming ever greater importance in the transmission of electric power. This requires development of equipment that takes highly precise and time synchronized measurements in DC systems. The data acquisition, the data transfer and a standardized communication interface are important factors to fulfill the requirements for secure and safe power system operation. This paper describes the development of one such system for HVDC measurement with communications interfaces compliant with IEC 61850… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
3
2

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 3 publications
(2 reference statements)
0
3
0
Order By: Relevance
“…Furthermore, based on GPS data and the assumptions made, the daily energy consumption of the vehicle during the departure has been calculated according to Equation (2). Equation (3) shows the value of the charging power at the possible time intervals selected. Examples of the vehicle routes are presented by GPS data, and they are shown in Figure 5.…”
Section: Modeling Evs-consumption and Driving Profilesmentioning
confidence: 99%
See 1 more Smart Citation
“…Furthermore, based on GPS data and the assumptions made, the daily energy consumption of the vehicle during the departure has been calculated according to Equation (2). Equation (3) shows the value of the charging power at the possible time intervals selected. Examples of the vehicle routes are presented by GPS data, and they are shown in Figure 5.…”
Section: Modeling Evs-consumption and Driving Profilesmentioning
confidence: 99%
“…Therefore, it is advisable to use all methods available to monitor system operation, including the detection of faults and disturbances. This observation is often limited to the measurements of power grid parameters and the energy balance in a specific node of the system with specialized devices (e.g., PMU devices, SCADA system) by transmission and distribution system operators [3]. A corresponding increase in the observability of the system is important in view of the growing number of new sources, including electric vehicles (EVs).…”
Section: Introductionmentioning
confidence: 99%
“…The recent researches have discussed the SCADA hardware and software upgrades and modifications. New communication infrastructures are proposed to cover AC and DC requirements [5][6][7] and new DC side RTUs are currently being characterised and researched [8][9][10]. A complete modern SCADA communication infrastructure can be split into four layers as shown in Figure 1a [4,7,11]:…”
Section: Introductionmentioning
confidence: 99%