Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC) 2019
DOI: 10.24928/2019/0120
|View full text |Cite
|
Sign up to set email alerts
|

Why Would Location-Based Scheduling Be Applicable for Offshore Oil and Gas Construction?

Abstract: The focus of this research in testing the applicability of location-based scheduling within the offshore oil and gas construction domain. The case investigated is a larger oil and gas field undergoing refurbishment in the Danish sector of the North Sea. The exploratory case study took a deductive approach by analyzing the existing location-based scheduling literature. The theoretical patterns allow testing the applicability of the theory in the offshore construction domain. Adapting the patterns from the const… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2021
2021

Publication Types

Select...
1
1

Relationship

2
0

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 15 publications
0
1
0
Order By: Relevance
“…One of the first lean construction tools was the Last Planner System™ (LPS) (Ballard 2000) which has proven its ability to improve planning effectiveness, e.g., Alarcón et al (2005); AlSehaimi et al (2009); Ballard (2000); Lerche et al (2020a). Later, the lean construction tool Location-Based Scheduling (LBS) emerged (Kenley and Seppänen 2010) and proved its ability to compress construction schedules (Evinger et al 2013;Lerche et al 2019a;Lerche et al 2019b;Seppänen et al 2014). Takt Time Planning (TTP), which is similar to LBS (Seppänen 2014), has also shown its ability to compress schedules (Heinonen and Seppänen 2016;Lerche et al 2020b).…”
Section: Background: Labour Efficiency and Lean In Constructionmentioning
confidence: 99%
“…One of the first lean construction tools was the Last Planner System™ (LPS) (Ballard 2000) which has proven its ability to improve planning effectiveness, e.g., Alarcón et al (2005); AlSehaimi et al (2009); Ballard (2000); Lerche et al (2020a). Later, the lean construction tool Location-Based Scheduling (LBS) emerged (Kenley and Seppänen 2010) and proved its ability to compress construction schedules (Evinger et al 2013;Lerche et al 2019a;Lerche et al 2019b;Seppänen et al 2014). Takt Time Planning (TTP), which is similar to LBS (Seppänen 2014), has also shown its ability to compress schedules (Heinonen and Seppänen 2016;Lerche et al 2020b).…”
Section: Background: Labour Efficiency and Lean In Constructionmentioning
confidence: 99%