2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) 2020
DOI: 10.1109/ieem45057.2020.9309885
|View full text |Cite
|
Sign up to set email alerts
|

Why a Systematic Investigation of Production Planning and Control Procedures is Needed for the Target-oriented Configuration of PPC

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 8 publications
(4 citation statements)
references
References 12 publications
0
4
0
Order By: Relevance
“…In literature, there are many conceptual frameworks for a universally valid description of PPC as well as basic, limited in scope approaches to derive a company-specific PPC configuration [16,29]. Likewise, there are branch-specific frameworks for PPC configuration, such as the work of Sendler [38], giving an overview of possible PPC configuration options for MRO service providers.…”
Section: Approaches To the Configuration Of Production Planning And Controlmentioning
confidence: 99%
See 3 more Smart Citations
“…In literature, there are many conceptual frameworks for a universally valid description of PPC as well as basic, limited in scope approaches to derive a company-specific PPC configuration [16,29]. Likewise, there are branch-specific frameworks for PPC configuration, such as the work of Sendler [38], giving an overview of possible PPC configuration options for MRO service providers.…”
Section: Approaches To the Configuration Of Production Planning And Controlmentioning
confidence: 99%
“…Serviceable parts SA: In order to meet the overall requirements, the final selection of PPC procedures needs to be done, taking into account the multidirectional interactions between PPC tasks and procedures, e.g. by integrating logistics models into the analysis [16]. If the selection is conducted isolated and without a holistic view on PPC and production configuration, there is a risk of locally optimising a single supply chain's component or area.…”
Section: Sequencing Rulementioning
confidence: 99%
See 2 more Smart Citations