2015
DOI: 10.1016/j.trpro.2015.09.012
|View full text |Cite
|
Sign up to set email alerts
|

What about Train Length and Energy Efficiency of Freight Trains in Rescheduling Models?

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
9
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
4
2
1

Relationship

1
6

Authors

Journals

citations
Cited by 15 publications
(9 citation statements)
references
References 23 publications
0
9
0
Order By: Relevance
“…The sketch map of intelligent TD is as shown in Figure 10. SBB has recently started the rollout of adaptive control system (from German Adaptive Lenkung, adaptive train control) on their network since 2014 [181], [182]. However, the predictive dispatching is needed to be carried out, by considering the disturbances, estimating the running times and the potential conflicts, and predicting the delay occurrence.…”
Section: ) Intelligent Tdmentioning
confidence: 99%
“…The sketch map of intelligent TD is as shown in Figure 10. SBB has recently started the rollout of adaptive control system (from German Adaptive Lenkung, adaptive train control) on their network since 2014 [181], [182]. However, the predictive dispatching is needed to be carried out, by considering the disturbances, estimating the running times and the potential conflicts, and predicting the delay occurrence.…”
Section: ) Intelligent Tdmentioning
confidence: 99%
“…The objective function can model train delays, customer inconvenience (delays, waiting times, connections missed, cfr. Caimi et al, 2012;Toletti and Weidmann, 2016) and/or energy targets (Toletti et al, 2015). Hereinafter, we aim at minimising the sum of arrival delays at scheduled stops or at the boundaries of the area, which can be computed in the following way…”
Section: Resource Conflict Graph Model For Local Rescheduling (Rcg)mentioning
confidence: 99%
“…Law 5 The load ratio η is closely related to the transportation organization under the constraints of railway network topology and transportation tasks. It involves the route optimization, the organization of passenger and freight flows, the choice of vehicle type, the organization of vehicle flows, the establishment of train plan, the operation of train formation and breakup [22], the compilation of train diagram, etc. Clearly, the operational energy efficiency improvement of all in-service trains is a complex and dynamic process integrated with the forecast of transportation tasks, the planning of transportation organization, and the actual transportation organizations.…”
Section: Station I Station I+1mentioning
confidence: 99%