2023
DOI: 10.2118/214287-pa
|View full text |Cite
|
Sign up to set email alerts
|

Wellbore Temperature Field During Cementing Pumping

Abstract: Summary To plan cementing operations in oil wells, predicting accurate circulating temperature is required. Failure to predict the circulating temperature can result in the wrong thickening time. To the best of our knowledge, correlation of the tables in API Recommended Practice 10B are usually chosen to predict bottomhole circulating temperature (BHCT), but both are not suitable in every block with a different geological condition. To design thickening time of the cement slurry, it is necessary… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 16 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?