1991
DOI: 10.2118/21105-pa
|View full text |Cite
|
Sign up to set email alerts
|

Well-Control Operations in Horizontal Wells

Abstract: This paper analyzes well control for horizontal wells. It presents a computer model for predicting the pressure behavior in a horizontal well during gas-kick removal and analyzes the simulation results for several field conditions. The paper also analyzes the drillpipe-pressure schedule, the kick-tolerance concept, and the swabbing effect during tripping out of the hole.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
16
0
1

Year Published

2001
2001
2024
2024

Publication Types

Select...
3
3
2

Relationship

0
8

Authors

Journals

citations
Cited by 38 publications
(17 citation statements)
references
References 3 publications
0
16
0
1
Order By: Relevance
“…Discretization of the partial differential Eqs. (1) through (3), using a finite difference method (Nickens, 1987;Santos, 1991), results in the following equations: where, u j i +1 =2 = u j i +1 + u j i 2 , u j n +1 = 2 = u j n + 1 + u j n 2 and uj n + 1 = 2…”
Section: Mathematical Formulationmentioning
confidence: 99%
“…Discretization of the partial differential Eqs. (1) through (3), using a finite difference method (Nickens, 1987;Santos, 1991), results in the following equations: where, u j i +1 =2 = u j i +1 + u j i 2 , u j n +1 = 2 = u j n + 1 + u j n 2 and uj n + 1 = 2…”
Section: Mathematical Formulationmentioning
confidence: 99%
“…If there is a single-phase region below the two-phase mixture, the pressure at the bottom of the two-phase mixture is calculated from Equation (6). For the two-phase region, a fully implicit finite difference method is applied for each discretized grid segment.…”
Section: Circulationmentioning
confidence: 99%
“…Well control simulation has received attention in recent years because of its applicability and flexibility, and many computer models (3)(4)(5)(6)(7)(8)(9)(10) have been developed to analyse the behaviour of a kick. The main objective of a kick simulator is to predict pressure and volume behaviour of kick fluids as a function of time.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Also the restructuring of a single flow valve structure, solves the problem of high density drilling fluid erosion, gas separation effect is poor and some weak points such as well control equipment has made significant progress, to avoid the emergence of well control equipment failure process technology to implement well control, ensure the continuity of well control technology implementation. At present, the well control equipment and technology of the ultra-high pressure gas well have been matched to form a set of well control technology [5,6] ,it can be used to guide the control of the high pressure gas wells in the future, and to make up for the shortage of the well control work [5][6][7][8] . Ultra high pressure gas well control equipment, the combination of three types: Combination type I mainly used for pressure level 70MPa (Table 1);Combination type II is mainly Used for pressure level 105MPa (Table 2); Combined supporting type III is mainly used for abnormal Table 1 Specification for the combination type of wellhead equipment and well control equipment for ultra-high pressure gas wells High pressure and abnormal area exploration of 105MPa.The well control equipment of the ultra-high pressure gas well is mainly composed of the following parts: 1).…”
Section: Introductionmentioning
confidence: 99%